Potential energy savings were identified and quantified for DaimlerChrysler in their Rastatt factory for different administration and production buildings. Amongst other things the aim of the investigation was an analysis of the weak points of the buildings in order to be able to derive from this knowledge action points for planned extensions.

Alongside the measuring analysis of the buildings through thermography computer-aided dynamic HVAC equipment simulation was also applied in order to identify the optimum control strategy in specific applications for ventilation and air-conditioning as well.
 
click to increase
click to increase


 

 
zurück to top